Project name: AES – VCM MONG DUONG POWER PLANT

  • Investor:  AES – VCM Mong Duong Power Plant
  • Package:  Supply, install Power socket U1, U2; Provide engineering, procurement, construction (EPC) for two Fly Ash Air Compressors System; Service for supply, install ESP bottom hoppers solenoid valves; Supply and install LED lighting system.
  • Contruction roles: Maincontractor
  • Contruction time: 2017 – 2018
  • Location: Mong Duong, Cam Pha, Quang Ninh

Project name: AES-VCM MONG DUONG POWER PLANT

Package: Provide engineering, procurement, construction (EPC) for two Fly Ash Air Compressors System

  • Investor:  AES-VCM Mong Duong Power Plant
  • Main contractor
  • 2017 – 2018
  • Location: Mong Duong, Cam Pha, Quang Ninh

Project name: AES-VCM MONG DUONG POWER PLANT

Package: Service for supply, install ESP bottom hoppers solenoid valves for both ESP units

  • Investor:  AES-VCM Mong Duong Power Plant
  • Main contractor
  • 2017 – 2018
  • Location: Mong Duong, Cam Pha, Quang Ninh

Project name: AES-VCM MONG DUONG POWER PLANT

Package: Supply and install LED lighting system at Turbine and Boiler

  • Investor:  AES-VCM Mong Duong Power Plant
  • Main contractor
  • 2018
  • Location: Mong Duong, Cam Pha, Quang Ninh