Scope of works:
- Maintenance, repair and upgrading of factory;
- Supply, install Power socket U1, U2;
- Provide engineering, procurement, construction (EPC) for two Fly Ash Air Compressors System; Service for supply, install ESP bottom hoppers solenoid valves;
- Supply and install LED lighting system;
- Fire stop cable_CCB area; Installation water to FGD.
Contruction roles: Maincontractor
Period: 2017 to now
Address: Mong Duong, Cam Pha, Quang Ninh